Updates include:
-motor relocation
-revamp of the cooling system
-finish rear swing out carrier
-patch all of the holes in the body, including the body mounts
-patch the frame up so the truck is safe again
-repaint
-rebuild NP203 and reseal the drive line to eliminate the leaks
-build second rear crossmember to hold the transfercases better to take the load off of the tranny case
-antiwrap bar
-I'm considering lowering it by moving the fixed end of the spring into the frame, but I don't want to fuck up my caster... it cruises real well now but we'll see
-finish sliders
-clean up engine bay/wiring
-and since the boss says things like as Stinson flopped "damn I missed it, bet that was fun!" and "I can't wait to flop!" it's time to look at a cage, espically if I finally have a decent floor to mount through!
Then it'll be on!
-tryin to squeeze gears and tires onto the list

End goal, to drive to Harlan and back again! Tow rig budgeted for fall of '09 but till then trailers will be for boats!